
Environmental Protection of Water Bodies from Acid Mine Drainage (AMD) using Permeable Reactive Barrier as Passive Treatment System
Project Coordinator:
Dr. Aileen Orbecido
Team Members:
- N/A
Funding Agency:
DOST-NRCP
Project Duration:
September 1, 2021 to August 31, 2022
Project Cost (PHP):
₱6,206,320.00
Project Cost (Other Currencies):
GBP 86328.61